 |
|
 |
 |
 |
 |
 Typical workload waiting to be processed. |
Powder coat large fabrications, paint stripping, anti corrosion pre-treatment. |
Loading
Two, 3 tonne fork- lifts.
Paint lines
Reported to be the largest box oven in the England for trade powdercoating.
10m x 4m x 3m capable of accommodating a 2.0 tonne component, or 4 tonnes of smaller items.
|
Plant 1,
25m camel back oven capable of accommodating 5m x1.5 at 120kg
rigged with 4 automatic gema guns.
Plant 2,
30m camel back oven capable of accommodating 6.5m x1.5 at 160kg
Removing paint
For liquid paints = alkali stripper tank 2.5m x1m x1m.
For powder coatings = Solvent tank 2.0m x 1.25m x 1.25m.
For powder coatings = Incinerator 4.0m x 2.3m x 1.25m.
Blasting
Two walking in grit blast bays:
Bay 1, blast medium = Aluminium oxide, capable of accommodating 11m x 1.0m x 2.7m high.
Bay 2, blast medium = Aluminium oxide, capable of accommodating 5m x 2.5m x 2m.
Cleaning
Acid Bath and spray
6m x 2.5 x 1m acid bath.
Pre-treatment
Chromate system sealed with acrylic resin.
Phosphate system sealed with phenolic resin
Able to anti-corrosive treat 11m long and large three-dimensional objects.
|
|
|
 |
| This is where you are within the website... Commercial coating > Facilities |